| Maintenance |
-
Driveway Lighting - Lamp Post
Bulb Replacement
Type of bulb - 50 Watt High Pressure Sodium, ED-17 Medium Base
Light Sensor and Other Post Parts
| Store |
Part Number |
Price |
Home Depot
Electrical Department |
7780-02B |
$13.95 |
N93 W14594 Whittaker Way
Menomonee Falls, WI 53051
(262)255-9588
For parts and advice call and ask for Rick Elleseg at (262)255-9588.
Sensor: We have begun discussions directly with the manufacturer of the light sensors for advice. The supplier is out of business. Rick can get the parts direct from the manufacturer.
Note: Rick said a better solution would be to place a photo sensor either at the garage weather tite box going to the lamp post or wire to a new box in the eave. Then bypass the light post sensor switch.
www.1000bulbs.com/Photo-Control-Switches/
-
How do I report a street light problem?
Entrance Lights
You can report it directly here:
Light Post # Location
00-L-01001 Winchester Pass and Plat Rd. (Phase I), Colgate
02-L-01753 Browning Ct. and Elmwood Rd. (Phase II), Hubertus
03-L-1890 Remington Trail and Elmwood Road (Phase III), Hubertus
04-L-01107 Winchester Pass and Monches (Phase IV), Colgate
Entrance Signage - Landscape Lighting
Driveway Light
Refer to driveway lighting FAQ. Typically it is the bulb. They last about 3 years and then begin to go on and off in cycles before they fail all together.
-
Where do I get mailbox parts?
Mahvelous Mailboxes and More is the store that supplied our mailboxes to the developer. You need to tell the salesperson that you are looking for the approved parts for Winchester Fields. Their store is in Menomonee Falls.
|
| Regulations |
-
What are the compliance requirements after building our home?
Prior to or Shortly After Occupancy
Within 1 Year
- TREES - Within one year from occupancy date, three (3) trees which have a minimum 2.5” diameter must be planted, a minimum of two (2) of these trees must be in the front yard. (See Sites Of Interest, or Message Board for helpful information).
- LANDSCAPING - Each lot must be landscaped and seeded/sodded within one (1) year from occupancy date. This includes the removal of ALL dirt piles. All yards must be mowed grass, no naturalization (uncontrolled weeds) allowed. (See Sites Of Interest, or Message Board for helpful information).
Within 2 Years
- DRIVEWAY - Each home owner must install a hard surface driveway & walkways within two (2) years from occupancy date.
Other Reminders
These are summaries, for full description of requirements, go to the Covenant Declarations.
-
What should I do if I want to add a 2nd garage or shed?
- Bill Bailey 414-807-3481
3) Develop blueprint plans for project
- size of 2nd garage dependent on acrage of property
6) Upon completion of project, contact Board for final approval of completed project
|